04 August 2014

Subfloor Progress

After several days of the laying under the trailer and screwing up the aluminum flashing, that step is finally done and it's time to move on to the remainder of the subfloor. Working above was still hard work, but so much faster.

First batts of wool insulation going in.

We dry fit the OSB over as we went down the length of the trailer.

Next step was vapor check; here you can see all three layers: insulation, vapor check, OSB.

Last of the vapor barrier down!


Didn't get a picture of the completed subfloor since we had to run around cleaning up and pulled a tarp over the completed subfloor within seconds of the rain starting. Rain has been a near constant so far during the build, but we've been able to keep things pretty safe and dry so far by having tarps ready to pull over at a moment's notice.